한국어

Case Studies

Real-world results from KESA power saving installations

All Industries
Manufacturing
Commercial
Industrial
KESA-200 Installation
Manufacturing

Automotive Parts Factory

Location: Gyeonggi Province, South Korea

Power Factor
0.75 → 0.98
Performance Improvement
Significant current reduction achieved
Cost Benefits
Substantial monthly savings realized
KESA-200 Model View Details
KESA Series Installation
Commercial

Large Office Building

Location: Seoul, South Korea

Power Factor
0.68 → 0.95
Performance Improvement
Significant current reduction achieved
Cost Benefits
Substantial monthly savings realized
KESA-50 + KESA-200 View Details
KESA-S10 Installation
Industrial

Steel Processing Plant

Location: Pohang, South Korea

Power Factor
0.62 → 0.96
Performance Improvement
Significant current reduction achieved
Cost Benefits
Substantial monthly savings realized
KESA-S10 Model View Details
KESA-200 Installation
Manufacturing

Electronics Assembly

Location: Incheon, South Korea

Power Factor
0.71 → 0.97
Performance Improvement
Significant current reduction achieved
Cost Benefits
Substantial monthly savings realized
KESA-200 Model View Details
KESA-S Series Installation
Commercial

Shopping Mall

Location: Busan, South Korea

Power Factor
0.65 → 0.94
Performance Improvement
Significant current reduction achieved
Cost Benefits
Substantial monthly savings realized
KESA-S03 + S10 View Details
KESA-300 Installation
Industrial

Chemical Processing

Location: Ulsan, South Korea

Power Factor
0.58 → 0.95
Performance Improvement
Significant current reduction achieved
Cost Benefits
Substantial monthly savings realized
KESA-300 Model View Details
Note: All case studies show real installation results from actual customer facilities. Performance improvements and cost benefits may vary depending on facility size, usage patterns, and local conditions. Contact us for a detailed analysis of your specific facility.